
技术
- 基础设施即服务 (IaaS) - 云计算
- 基础设施即服务 (IaaS) - 云存储服务
适用行业
- 航天
服务
- 云规划/设计/实施服务
挑战
一个的主要挑战是整合服务。他们有一个集引擎的类的类的东西,通过API与接口开始接口之类的基础设施需要在基础设施定义期间。运行了几个测试,并且这些测试中的每一个都必须通过。
客户
ESA(欧洲航天局)
关于客户
欧洲航天局(ESA)是欧洲航天局(ESA)的预告片。它的使命是欧洲航天局的后续,并确保太空投资和世界公民带来利益。
ESA RSS 服务提供资源以支持地球实际数据的开发。通过使用户挖掘数据来支持数据访问和数据处理。并通过提供各种平台和环境。RSS还支持开发新的应用程序和服务,以生成新的应用程序和服务。来自地球数据的增值信息。
解决方案
目前,RSS 使用 Sigma 的计算能力和存储在集群存储系统上的卫星数据。他们的目的是提供,地球云用户可以在其中开发的算法流程正在创建环境。的目的是帮助研究人员虚拟环境。和服务时间和他们的研究,节约成本。
横向扩展磁存储为团队的 RSS 团队提供了具有成本和存储能力的卫星存储需求,具有运行分析数据和计算性能和可扩展性。
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.

Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.

Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.

Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.

Case Study
SAP Leonardo Enabling Rocket Science
At times, ULA has as many as 15 different operating systems dedicated to overlapping processes, such as rocket design, testing, and launch. Multiple systems created unnecessary costs and unwanted confusion among workers at offices, factories, and launch sites in different location. In order to improve collaboration and transparency during vital activities that directly influence mission success, ULA wanted to improve data sharing and streamline manufacturing processes.