Case Studies.

Add Case Study

Our Case Study database tracks 8,303 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (3)
    • (2)
    • (1)
    • (1)
    • (1)
    • (1)
    • View all
  • (3)
    • (3)
  • (2)
    • (2)
  • (1)
    • (1)
  • (1)
    • (1)
  • View all 6 Technologies
  • (2)
  • (1)
  • (2)
  • (1)
  • (2)
  • (1)
  • (1)
  • (3)
Selected Filters
3 case studies
Sort by:
Refrigeration System Monitoring - Condis Supermarkets - SmartDataSystem Industrial IoT Case Study
Refrigeration System Monitoring - Condis Supermarkets
The CONDIS supermarket chain needed to control reliably that its industrial refrigeration machines were operating correctly. At the same time the solution had to allow for manual testing of the level of refrigerant in the gas circuit when required, from the platform itself. This way they can act quickly in response to an alarm that the system itself should be capable of generating.
Download PDF
Optimizing Energy Utilization (Barcelona City Council)   - SmartDataSystem Industrial IoT Case Study
Optimizing Energy Utilization (Barcelona City Council)
The Barcelona City Council manages about 2000 municipal buildings and as expected the energy expenditure is very high. Hence, the objective was to closely monitor and control how these buildings are consuming and, in some cases, producing energy. Specifically, the aim was o determine the degree of utilization of energy produced by solar thermal systems in multifamily buildings. The project consisted on controlling and monitoring 28 solar thermal systems. It was divided into three phases; a pilot phase to monitor 4 initial sites, a second phase where 16 more were added, and a third phase where the final 8 were included.
Download PDF
Monitoring Energy Consumption (Asco City Council) - SmartDataSystem Industrial IoT Case Study
Monitoring Energy Consumption (Asco City Council)
The Ascó City Council wanted to monitor and control all 16 municipal facilities it manages, as a means of improving energy efficiency. The project first phase objective is to monitor the energy consumption of the city hall building and to automate and control HVAC equipment distributed across various floors on the building.
Download PDF

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
Submit

Thank you for your message!
We will contact you soon.