
技术
- 分析与建模 - 实时分析
- 功能应用 - 远程监控系统
适用行业
- 食品与饮料
- 金属
- 造纸
- 塑料
适用功能
- 设施管理
- 维护
用例
- 能源管理系统
服务
- 数据科学服务
- 硬件设计与工程服务
- 软件设计与工程服务
- 系统集成
挑战
钢铁制造厂每月加工 160 吨至 200 吨钢材。
工厂希望减少电力支出。评估了太阳能电池板,但由于投资回报期,项目放弃了。
工厂有 APFCR 以保持高功率因数。
关于客户
一家钢铁制造厂,通过等离子切割、金属成型、金属成型、拉通焊接和喷丸/喷漆工艺加工钣金、板材和梁。
解决方案
Dataranya 提出了能源监测和目标。
分米单个机器组以水平负载最大需求,基准机器组。
检查在白班和夜班之间调整能源密集型操作的可行性。
在达到合同要求的阈值消耗(例如,公用事业合同要求的 80%、90%)时通知工厂经理的警报。
收集的数据
Asset Utilization, energy consumption
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.

Case Study
Goldcorp: Internet of Things Enables the Mine of the Future
Goldcorp is committed to responsible mining practices and maintaining maximum safety for its workers. At the same time, the firm is constantly exploring ways to improve the efficiency of its operations, extend the life of its assets, and control costs. Goldcorp needed technology that can maximize production efficiency by tracking all mining operations, keep employees safe with remote operations and monitoring of hazardous work areas and control production costs through better asset and site management.

Case Study
The Kellogg Company
Kellogg keeps a close eye on its trade spend, analyzing large volumes of data and running complex simulations to predict which promotional activities will be the most effective. Kellogg needed to decrease the trade spend but its traditional relational database on premises could not keep up with the pace of demand.

Case Study
Plastic Spoons Case study: Injection Moulding
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.

Case Study
KSP Steel Decentralized Control Room
While on-site in Pavlodar, Kazakhstan, the DAQRI team of Business Development and Solutions Architecture personnel worked closely with KSP Steel’s production leadership to understand the steel production process, operational challenges, and worker pain points.

Case Study
Bluescope Steel on Path to Digitally Transform Operations and IT
Increasing competition and fluctuations in the construction market prompted BlueScope Steel to look toward digital transformation of its four businesses, including modern core applications and IT infrastructure. BlueScope needed to modernize its infrastructure and adopt new technologies to improve operations and supply chain efficiency while maintaining and updating an aging application portfolio.

Case Study
RobotStudio Case Study: Benteler Automobiltechnik
Benteler has a small pipe business area for which they produce fuel lines and coolant lines made of aluminum for Porsche and other car manufacturers. One of the problems in production was that when Benteler added new products, production had too much downtime.