Accelerating the Industrial Internet of Things
Log In
Case Studies
    ANDOR
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (5)
  • (2)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (3)
  • (2)
  • (2)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (1)
  • (1)
    ANDOR
  • (4)
  • (2)
  • (2)
  • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (5)
5 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
OneWireless Enabled Performance Guarantee Test
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Download PDF
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Tata was facing data accessibility challenges in the cement plant control room tapping signals from remote process control areas and other distant locations, including the gas scrubber. Tata needed a wireless solution to extend its control network securely to remote locations that would also provide seamless communication with existing control applications.
Download PDF
Honeywell Analytics Efficiency Improves with Eden
Honeywell Analytics Efficiency Improves with Eden
Honeywell Analytics established a customer service call centre which has ten call centre agents handling 1,500 calls per week.The agents were using a customer management software which was effective for capturing basic customer details, but inadequate for collating a service record for the customer's individual unit or linking to other company IT systems. An integrated system was needed to manage the process from initial customer call through to successful resolution such as the dispatch of a replacement or repaired product.
Download PDF
Turning A Stadium Into A Smart Building
Turning A Stadium Into A Smart Building
Honeywell created what it called the “intelligent system” for the National Stadium in Beijing, China, turning the venue for the opening and closing events at the 2008 Summer Olympics into a “smart building.” Designed by highly controversial artist Ai Weiwei, the “Bird’s Nest” remains one of the most impressive feats of stadium architecture in the world. The 250,000 square meter structure housed more than 100,000 athletes and spectators at a time. To accommodate such capacity, China turned to Honeywell’s EBI Integrated Building Management System to create an integrated “intelligent system” for improved building security, safety and energy efficiency.
Download PDF
River Rock Casino’s Surveillance
River Rock Casino’s Surveillance
Doug Gilroy and Mark Bayrock of Advanced Audio Concepts, a Vancouver-based systems integrator, were given free reign to design, install and operate River Rock's complex surveillance system. Gilroy had freedom to design the system with several unique aspects, such as the use of video balun technology to integrate quickly, and an innovative design in the tech room that makes it easier for the operator to spot problems. The integrators also had a long-standing relationship with Honeywell and chose to use Honeywell products almost exclusively throughout the installation.
Download PDF
test test