Case Studies.
Add Case Study
Our Case Study database tracks 19,090 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(3)
- (2)
- (1)
-
(1)
- (1)
-
(1)
- (1)
-
(1)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
- View all 5 Industries
- (3)
- (2)
- (1)
- (1)
- (2)
- (1)
- (1)
- (3)
- (8)
Selected Filters
|
Improved Efficiency by 30% for a Measuring Equipment Manufacturer
The company challenges are as follows:Time-consuming manual data entries of temperature, pressure, moisture, etc., in PDF Inefficient data tracking & migration to another serverLack of a central repository to store the data in real-timeUnable to generate the certificate in a no-network zoneUnable to update the information on-the-go
|
|
|
Developed a digitalized warehouse management system
Manual errors in warehouse managementProblems such as inventory theft, delayed shipment, and the need for double verification of inventory
|
|
|
Streamlined Daily Transport Operations
The challenges are as follows:Extreme traffic congestionDegradation of ambient air qualityLack of forecasts for traffic operationsLack of transit fleet operation information from varied transportation systems
|
|
|
Digitized Warehouse Operations for an Automobile Firm
The company's challenges are as follows;Manual errors in warehouse management.Problems such as inventory theft, delayed shipment, and the need for double verification of inventory
|
|
|
Simplified Manufacturing and Billing Process
Unable to deliver the production quantity in the expected time by maintaining the scheduling parameters and level the capacity parameters too.The customer should place the sales order in the first plantThe manufacturing of the products should be done in different plants (i.e. assembly of the product happens in the plant (first) and semi-finished products are produced in another plant (second)The demand from the first plant should come to the second plant, and it needs to be produced by them according to the requirementAfter manufacturing the semi-finished product, the products from the second plant stock should be shipped (stock transport order) to the assembly first plant for the assembling process
|
|
|
Achieved Efficient Indirect Tax Reconciliation
Challenges as follows:Struggled to determine: which tax (CGST/SGST/IGST) and how much tax was applicable on goods for import & export; tax based on Point of Supply (POS) mapping; certain businesses that are exempted under GST lawFaced issues of duplication of invoicesIdentified risks related to the unavailability of the mandatory data as per GSTN format
|
|
|
Encouraged Autonomous Trade Engagements for an IT Company
The company challenges are as follows:Challenges in conventional B2B trading practiceChallenges in validating the trustworthiness of the counterpartiesLoss of actual and potential revenuesLengthy & expensive dispute resolutionMissed sales opportunities & overhead costs for B2B vendors
|
|
|
Encouraged Autonomous Trade Engagements
The challenges are as follows:Challenges in conventional B2B trading practice Challenges in validating the trustworthiness of the counterparties Loss of actual and potential revenues Lengthy & expensive dispute resolution Missed sales opportunities & overhead costs for B2B vendors
|
|