GE Digital (GE) Case Studies Tacoma Power Reduces Cost and Risk with HMI and SCADA Virtualization

Tacoma Power Reduces Cost and Risk with HMI and SCADA Virtualization

GE Digital (GE)
Tacoma Power Reduces Cost and Risk with HMI and SCADA Virtualization
Construction & Buildings
Maintenance
Factory Operations Visibility & Intelligence

Tacoma Power, located in Tacoma, WA, serves 160,000 electric utility customers with nine hydro facilities on four rivers. The company’s generation automation team, consisting of three engineers and one engineering technician, is responsible for the integration, modernization. With a small staff responsible for overseeing a number of different environments, the company was looking to implement its HMI/SCADA system in a virtual environment for automation and control in order to optimize operations and reduce costs.

Read More

Tacoma Power is a public utility providing electrical power to Tacoma, Washington and the surrounding areas. Tacoma Power serves the cities of Tacoma, University Place, Fircrest, and Fife, and also provides service to parts of Steilacoom, Lakewood and unincorporated Pierce County. 

Read More

To make the business case for virtualization, Tacoma Power management reviewed the costs and benefits. The justification was clear, as the company proved a small upfront investment with savings in the long run through speed, uptime, and significant risk reduction. With approval and support to proceed at the executive level, Tacoma Power added virtualization to its regular budget for system life-cycle replacement, leveraged an IT consultant for expert advice, and planned its deployment process.

The company deployed a multi-phase virtualization project with GE Digital’s HMI/SCADA iFIX using Microsoft Hyper-V across its hydroelectric and fish hatchery facilities. In addition to visualization and control, Tacoma Power also implemented iFIX for trending, troubleshooting, and continuous optimization. Data collection and management is critical for regulatory reporting as well as day-to-day operations. And, giving operators access to HMI screens from remote devices was important for speeding response to hatchery related alarms.

Read More
Maintenance Records, Product Lifecycle, Speed, Uptime, Water Usage
Read More
IT
Read More
Emerging (technology has been on the market for > 2 years)
Read More

Tacoma Power incorporated the virtual deployment into the plant’s regular hardware and software upgrade schedule, which eliminated any possibility of extra disruption, downtime, or cost.

Leading the power industry with virtualization, Tacoma Power expects to complete the migration of all power generation automation systems within five years. 

Maintenance of industrial control systems for:

  • 23 hydroelectric generators that generate 3 billion kilowatt hours of electricity each year
  • 4 fish hatcheries to support wildlife conservation
Download PDF Version
test test