ABB > Case Studies > Metal Fabrication

Metal Fabrication

ABB Logo
 Metal Fabrication - IoT ONE Case Study
Technology Category
  • Robots - Articulated Robots
  • Robots - Robot Application & Programming Software
Applicable Industries
  • Equipment & Machinery
Applicable Functions
  • Process Manufacturing
Use Cases
  • Material Handling Automation
The Challenge

As each mast section needs a total of 222 reliable welds, manufacturing them is an extremely labor intensive process.

Until recently, STROS had to use highly skilled welders to make these sections. Although it has been using robots for 25 years, these machines could not manage the complex arc welds in narrow spaces needed for these particular components. Consequently, in order to produce a satisfactory number of mast sections it had to employ three welders per shift at three separate workstations to make these pieces. Apart from the obvious outlay this required in terms of manpower and space, STROS found it increasingly difficult to recruit the highly qualified welders needed for this work. That's why in 2007 the company decided to hold a tender for the complete robotization of its manufacturing process for mast sections. Of the four firms who participated, only the ABB group could fulfill all its requirements.

The Customer
About The Customer
With 50 years in the business, STROS is one of the world’s leading suppliers of hoist machinery for building sites. It supplies high-quality work platforms as well as customized personnel and material hoists.
The Solution

The process arm's fluid interaction with the positioner is an impressive feat of balletic synchronicity, which according to Škorpa could not have been achieved without ABB's readiness to work closely with STROS in designing the system. STROS uses a rotating IRBP 500 D positioner with two workstations to hold the individual parts of the mast section that are to be welded before the final piece is completed. This means that the robot is in constant use, because an operator can prepare pieces for welding on one side of the positioner while the other part is being welded.

The positioner then rotates and welding continues while the operator removes the completed part on the other side and prepares the next component. The standard combined cycle time for making one mast section is 54 minutes, which is three times quicker than the time required by a human welder to make the same piece.  

Quantitative Benefit
  • One tailor-made robotized workstation produces the same number of pieces per eight-hour shift as three human welders would.

  • Robot welding systems ensure consistent highquality welds without any of the deviations produced by human welders.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

Related Case Studies.

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
Submit

Thank you for your message!
We will contact you soon.