Case Studies
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (1)
  • (1)
    ANDOR
  • (2)
    ANDOR
  • (2)
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
CSL Faster and Stronger
CSL Faster and Stronger
ZTE
In order to keep a leading position in the new Internet era, CSL makes a strategic decision to upgrade the whole network, for guaranteeing the development of high-speed data service.
Download PDF
ZTE's Integrated Battery-DG Hybrid Energy Storage Solution
ZTE's Integrated Battery-DG Hybrid Energy Storage Solution
ZTE
For cities and companies involved in new construction or site transformations, areas with unstable or poor quality power can cause problems and diesel and other similar generators can add another one: expense. In the context of high traditional energy prices, the trend of low-carbon, energy saving, environmental protection, renewable energy will become increasingly important in the field of communications power supply. Especially along with its technology improvement, the traditional renewable energy hybrid power solution can’t fully meet with customer’s demands, especially on the energy management, energy monitoring, system upgrading, product efficiency, environment adaptability, etc.
Download PDF
test test