Accelerating the Industrial Internet of Things
Log In
Case Studies
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (2)
  • (2)
    ANDOR
  • (2)
  • (2)
    ANDOR
  • (2)
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
NASA Meets Satellite Project Testing And Verification Goals
NASA Meets Satellite Project Testing And Verification Goals
Rising development and maintenance costs comprise the key business challenge of testing and verification for NASA IV&V. Because of their complexity and stringent safety requirements, most NASA projects take many years to come to fruition.
Download PDF
General Dynamics Uses Wind River Simics to Meet NASA Challenge
General Dynamics Uses Wind River Simics to Meet NASA Challenge
In designing and building Fermi, the General Dynamics C4 Systems business unit was faced with a challenge: it needed to provide an environment that could support rigorous testing by multiple Fermi subsystem groups before the spacecraft hardware was available.
Download PDF
test test