Accelerating the Industrial Internet of Things
Log In
Case Studies
    ANDOR
  • (2)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (4)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (1)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (4)
  • (2)
  • (1)
  • (1)
    ANDOR
  • (4)
4 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
Blockchain Technology for Information and Communication Technology
Blockchain Technology for Information and Communication Technology
The efforts involved in the application of blockchain technology have highlighted several technical challenges. These include the necessity of a more robust security technology that enables its safe use and faster processing speed. 
Download PDF
Modern Bakery
Modern Bakery
Modern Bakery was burdened with an outdated and inefficient collection of ERP (enterprise resource planning) systems that were limited in functionality and could no longer support the company's growth.
Download PDF
Real-Time IoT Tracking and Visualization Improve Manufacturing
Real-Time IoT Tracking and Visualization Improve Manufacturing
Shimane Fujitsu, a wholly-owned subsidiary of Fujitsu and a leading manufacturer of business notebooks and tablets, set out to improve processes where factory inspections found product errors. Prioritizing product rework based on shipping date was challenging, and it caused Shimane Fujitsu to incur additional shipping fees. The company needed a way to collect data to better track the location of products in the rework cycle as well as monitor progress in real time. The collected data would also help process analysis for future improvements. 
Download PDF
Toyota Motor Manufacturing Indonesia
Toyota Motor Manufacturing Indonesia
Improve new system developments and existing system adjustments lead-time in order for the business to achieve maximum benefits as soon as possible, thus providing a competitive edge for Toyota against competitors. TMMIN IT environment was built on a complex of systems added up complexity in each development or adjustment project.
Download PDF
test test