Case Studies
    ANDOR
  • (2)
    ANDOR
  • (2)
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (2)
  • (1)
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (2)
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
Driving the Future of Smart Energy
Driving the Future of Smart Energy
In 2011, BC Hydro began an ambitious smart grid project that included replacing old electromechanical meters with nearly two million state-of-the-art smart meters. The company undertook its industry-leading smart grid rollout with the goals of improving energy efficiency and reliability in the region while reducing losses and more quickly identifying power outages. As BC Hydro began its smart meter roll-out, the leadership quickly recognized that without the right technology, it would face significant challenges integrating data from so many different sources throughout its operations.
Download PDF
Modernizing a Legacy Energy Grid
Modernizing a Legacy Energy Grid
For AusNet, this represented a tremendous challenge to replace 700,000 legacy meters across a diverse geographical environment creating additional network communications coverage complexity. The Victorian state government also required that the new meters would need to maintain high-performance levels for 15 years. To demonstrate compliance and smart grid uptime, AusNet would need to consistently produce accurate meter performance data on a daily basis for 20 market retailers. This required integrating and analyzing massive volumes of smart grid data in real-time.
Download PDF
test test