Johnson Controls > Case Studies > Business Continuity and Energy Savings of Primary Data Centre

Business Continuity and Energy Savings of Primary Data Centre

Johnson Controls Logo
 Business Continuity and Energy Savings of Primary Data Centre - IoT ONE Case Study
Technology Category
  • Automation & Control - Automation & Process Control Systems
Applicable Industries
  • Telecommunications
Applicable Functions
  • Facility Management
Use Cases
  • Building Energy Management
The Customer
About The Customer
Ericsson, a Swedish company founded in 1876, is a world leading company in the rapidly changing environment of communications technology – providing equipment, software and services to mobile and fixed network operators. 40 percent of global mobile
The Challenge

Ericsson required a new chiller solution to replace the three outdated Trane chillers that supplied the data centre’s cooling. For the new retrofit, the company needed a solution with tangible results, high reliability, as well as a centralized support and no downtime during the project.

The Solution

As technology is upgraded continuously, the load profile of a data centre evolves. To get clear insight into the requirements of the Athlone site, Johnson Controls performed a detailed energy audit, taking into account future demands. Thanks to the audit, Johnson Controls calculated the baseline of the cooling requirements and delivered a reliable prediction on true energy savings. It allowed them to propose a total turnkey solution centered around the YVAA high efficiency chiller and the plus dry-cooler. This solution supported by the elaborated results of the survey, convinced Ericsson to assign the project to Johnson Controls. In November 2013, Johnson Controls started the implementation of two YVAA chillers and one dry cooler, 600kW each, with one chiller serving as back-up. Thanks to this back-up chiller, Ericsson can do loose maintenance on either machine without any disruption. The Building Management System (BMS) was also upgraded to ensure full-automated control of the cooling system. Another advantage is that the BMS allows the measurement of energy savings and performance in real-time. To centralize the support and coordination of the project, Johnson Controls assigned a dedicated project manager to the project. Thus facilitating the communication and on-site support with Ericsson and allowing short response time in case of emergency, now and in the future.

Data Collected
Electricity Meters, Cooling Meters
Operational Impact
  • [Cost Reduction - Energy]
    After leading a detailed energy survey, Johnson Controls replaced the refrigeration solution, which resulted in higher reliability and significant energy savings.
Quantitative Benefit
  • The dry-cooler can take the anytime full load ambient temperature to 9°C and below and provides partial cooling when temperature is above 9°C ambient conditions.

  • During the winter months, Ericsson is achieving a coefficient of performance (COP) of 30, delivering 30kW of cooling for every 1kW of electricity consumed. Even before the project was finalized in December 2013, the customer had already noticed significant energy savings.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

Related Case Studies.

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
Submit

Thank you for your message!
We will contact you soon.