Case Studies.

Add Case Study

Our Case Study database tracks 8,303 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (1)
    • (1)
  • (1)
    • (1)
    • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
  • View all 5 Technologies
  • (1)
  • (1)
  • (1)
  • (2)
  • (1)
  • (1)
  • (1)
  • (3)
Selected Filters
3 case studies
Sort by:
Turning A Stadium Into A Smart Building - Honeywell Industrial IoT Case Study
Turning A Stadium Into A Smart Building
Honeywell created what it called the “intelligent system” for the National Stadium in Beijing, China, turning the venue for the opening and closing events at the 2008 Summer Olympics into a “smart building.” Designed by highly controversial artist Ai Weiwei, the “Bird’s Nest” remains one of the most impressive feats of stadium architecture in the world. The 250,000 square meter structure housed more than 100,000 athletes and spectators at a time. To accommodate such capacity, China turned to Honeywell’s EBI Integrated Building Management System to create an integrated “intelligent system” for improved building security, safety and energy efficiency.
Download PDF
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless - Honeywell Industrial IoT Case Study
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Tata was facing data accessibility challenges in the cement plant control room tapping signals from remote process control areas and other distant locations, including the gas scrubber. Tata needed a wireless solution to extend its control network securely to remote locations that would also provide seamless communication with existing control applications.
Download PDF
OneWireless Enabled Performance Guarantee Test - Honeywell Industrial IoT Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Download PDF

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
Submit

Thank you for your message!
We will contact you soon.